Lee Tunnel
Creating a cleaner, healthier River Thames
“We are
now in the second year of the largest contract ever awarded in the privatised water
industry with CEMAR providing an invaluable tool in its efficient administration.
The system is user-friendly and saves time by providing immediate real-time reporting
of the status of early warnings, compensation events and other contract matters...”
Mark Sneesby, Project Manager, CH2M HILL
|

Work has started on the £635m, four-mile long
Lee Tunnel project, which will prevent 16 million tonnes of sewage discharging into
the River Lee each year from the largest sewer overflow point at Abbey Mills Pumping
Station in Stratford.
CEMAR is being used to manage administration on the project between the project
management team and the principal contractor, MVB.
• January 2010 to mid 2015
• NEC3 ECC Option C
• Employer: Thames Water
• Project Manager: CH2M HILL
• Contractor: Morgan Sindall, VINCI Construction Grands Projects and Bachy
Soletanche
CEMAR incorporates the activity Schedule and the ability to associate quotations
and other events and matters; affording powerful management and reporting.
CEMAR has administered circa 2,000 communications under the project to date, each
one NEC3 compliant, accessible, auditable and consistent.
"We are now in the second year of the largest contract
ever awarded in the privatised water industry with CEMAR providing an invaluable
tool in its efficient administration. The system is user-friendly and saves time
by providing immediate real-time reporting of the status of early warnings, compensation
events and other contract matters as they are progressed under this NEC3 contract.
There has been universal approval by the project team, both by those involved in
day-to-day contract administration and also those needing access to the data held
within the system."
Mark Sneesby, Project Manager, CH2M HILL
"The CEMAR system has been, and continues to be, an
exceptionally effective and efficient tool to proactively manage contract administration
for the Project, in accordance with the contractual requirements and obligations,
providing optimum visibility of issues for many users to observe."
Francois Pogu, Project Director, MVB
To download a pdf copy of this case study click here
|
|
Magnox
national portfolio of Nuclear Decommissioning work
“Converting
the project to a web based intuitive management system has transformed the management
function. It has improved the flow of information between the parties including
maintaining the rigid NEC3 timescales for responses.”
Philip Peeke-Vout, Project Manager, Chapelcross Site
Magnox Limited
|

Implementation of CEMAR across Magnox’s national portfolio
of nuclear decommissioning work has been a resounding success. We look forward to
continuing to serve Magnox and their extensive supply chain with our simple and
effective system for administering NEC3.
CEMAR has administered thousands of communications across the Magnox portfolio of
circa 120 contracts - each NEC3 compliant, accessible, auditable and consistent.
“I’ve been using CEMAR for a couple of months now and
learning a lot as I go. I find CEMAR an extremely useful tool and I wonder how I
ever managed contracts without it.”
Nicola Smith-Lee MCIPS, Senior Contract Specialist,
Dungeness Site Magnox Limited
"This product is a dream come true for any Service
Manager running a large Facilities Management Contact. Administration of my contract
can now be handled by this flexible, easily to use and well supported product. Correspondence
tracking and communications with the contractor is now much quicker and simpler
than the manual paper and spreadsheet methods I was using previously. A very good
product with great potential!
There has been universal approval by the project team, both by those involved in
day-to-day contract administration and also those needing access to the data held
within the system."
Mike Bennett, Contract Manager, Oldbury Power Station
"I have been using CEMAR for the past year and it has
cut down the administration paperwork considerably. The software enables the management
of NEC3 contracts to be seamless with full auditability. The CEMAR team are always
helpful and responsive and deal with any queries/issues quickly and a pleasure to
deal with.
Helen Dove, Senior Contract Specialist, Bradwell Reactor
Site
"I'd say it's the most user friendly system I've used
without the need to look at the user guide."
John Ring BSc, Senior Commercial Controller Doosan
Power Systems Ltd
"Converting the project to a web based intuitive management
system has transformed the management function. It has improved the flow of information
between the parties including maintaining the rigid NEC3 timescales for responses."
Philip Peeke-Vout, Project Manager, Chapelcross Site
"To date I'm very impressed with CEMAR. As a contract
administration tool it ticks all the boxes and is very easy and intuitive to use.
It offers excellent flexibility in that it can be accessed anywhere with internet
capability, and I particularly like the email prompting (which eliminates the excuses
factor!). Technical support is a similar story. The only issues we've had have been
with the specific nuances of our projects, which were remedied immediately anyway.
User requests are processed quickly and training has received good feedback from
participants. On the whole, a good service executed well!"
Mark McLinden, Principle Quantity Surveyor
"CEMAR has enabled us to easily track & review contractual
notifications, and share the outcomes with the wider team remotely. CMToolkit have
been very responsive in introducing new features where requested, and I would recommend
the software to any user of the NEC contract."
Matthew Donnison, Framework Quantity Surveyor Costain
Energy & Process
"The CEMAR system has proved to be an efficient tool
to improve the contract management interface between the parties, preserving the
contractual requirements and obligations, and up to date accurate information."
Commercial Manager Kitsons Environmental Europe Limited
|
|
White Cart
Water Flood Scheme Prevention Glasgow
“CEMAR
is an exceptionally useful tool for managing contracts using the NEC form of contract.
It provides quick access to real time data and helps to improve the flow of information
between parties.”
Alan McGowan CEng BEng MICE, Project Manager, Halcrow
Group Limited
|

Glasgow City Council’s flood prevention scheme addresses the risk posed by
the White Cart Water and its tributary the Auldhouse Burn. The scheme commenced
following approval by Scottish Ministers in 2006 and is expected to complete February
2012.
CEMAR is being used as the core contract administration system on the circa £30m
project that comprises the formation of three flood storage areas upstream of the
city. Since January 2009 the system has administered approximately 6,000 communications,
each one consistent, compliant, auditable and accessible.
• December 2008 to February 2012
• Circa £30m
• NEC3 ECC Option A
• Employer: Glasgow City Council
• Contractor: Volker Stevin
• Consultant: Halcrow
• CEMAR incorporates the Activity Schedule and the ability to associate quotations
and other events and matters; affording powerful management & reporting
• CEMAR has administered circa 6,000 communications under the project to date
"CEMAR is an exceptionally useful tool for managing
contracts using the NEC form of contract. It provides quick access to real time
data and helps to improve the flow of information between parties."
Alan McGowan CEng BEng MICE, Project Manager, Halcrow
Group Limited
"The system works effectively and efficiently, is simple
to use and very user friendly."
Steven Garrigan, Construction Manager, Volker Stevin
Limited
Visit White Cart Water Project for
more info.

To download a pdf copy of this case study click here
|
|
Belfast
Community Housing Association
“The Association
views the CEMAR system as an essential tool in the successful operation of our Term
Service Maintenance Contract. We are further encouraged by Client Managers Toolkit
ongoing development and improvement of the system.”
Scott Thompson, Head of Development & Property
Services, Belfast Community Housing Association
|

Belfast Community Housing Association are pioneering the use of the NEC3 Term Service
Contract in Northern Ireland.
The association together with their term contractor MJ Shaw are using the CEMAR
system to administer their NEC3 TSC contract. Services comprise reactive maintenance,
welfare adaptations, boiler servicing, cleaning and grounds maintenance to approximately
850 accommodation units.
Now in the second year and with circa 5,000 task orders, the consistent, compliant,
auditable and accessible approach to administration that CEMAR provides is proving
hugely valuable. Together with a powerful suite of contract performance and financial
reporting, the CEMAR system has delivered significant added value and cashable savings.
• October 2009 to October 2011 (with possible extensions)
• Circa £4m, NEC3 TSC Option A
• Employer: Belfast Community Housing Association
• Contractor: MJ Shaw
• Price List incorporated into system making ordering and payment of routine
and reactive maintenance works simple and convenient
• CEMAR has to date administered circa 17,000 communications under the contract;
each consistent, compliant, auditable and accessible
"The Association views the CEMAR system as an essential
tool in the successful operation of our Term Service Maintenance Contract."
Scott Thompson, Head of Development & Property
Services Belfast Community Housing Association
"An invaluable tool for keeping track/control/records
- with first-class support."
Paul O'Neill, Director, Ballynafeigh Housing Association
"CEMAR simplifies the NEC contract for me and my staff."
Jonny Shaw, Managing Director, MJ Shaw Limited
Visit Belfast Community Housing Association Ltd for more info.

To download a pdf copy of this case study click here
|
|
Gloucestershire
County Council
“I have
now used CEMAR for several years and found the software extremely user friendly.
As a web based product the toolkit can be used at any location with an internet
connection. This is fantastic and so useful to track your projects when you are
off site... An excellent product for administering NEC projects.”
Mark Collins, Principal Engineer / Project Manager,
Gloucestershire Highways
|

Gloucestershire County Council recently announced CMToolkit Ltd as their preferred
supplier of NEC3 administration systems. To date CEMAR has administered circa 6,000
communications across their portfolio of works.
Recent high profile projects where CMToolkit’s system CEMAR is being used
to manage NEC3 administration include; the Gloucester South West Bypass; Gloucester
Quays Linkages; Merrywalks Bridge Stroud; and Coopers Hill A46 land stabilisation.
Gloucester South West Bypass - Netheridge Section £22m
One mile of new highway construction on earthwork embankment over alluvial flood
plain; 300m section of new sheet piled ship canal; 850 tonne steel swing bridge;
various associated M&E; and infill of old canal.
• Delivered an £80,000 cashable Gershon Saving
• Enhanced administration of risk and change
• Improved financial management, dynamic reports and charts used by project
teams and stakeholders including SWRDA
• Handled Circa 2,500 communications.
• Employer: Gloucestershire County Council. (comms entered by admin team).
• Contractor: Norwest Holst
• Consultant: Halcrow.
"The use of CEMAR assisted in 96% of all compensation
events implemented within the contractual period."
Paul Crick, Capital Programme Manager Gloucestershire
County Council.
"As Project Manager the main advantage to me is the
added value element of being able to have ‘real time’ information instantly
available. In effect this adds significantly to the management of the project as
it facilitates more frequent interrogation of the progress of the compensation events,
thus enabling positive actions to make sure that contractual time scales are maintained."
David Hughes, Project Manager formerly of Halcrow.
Merrywalks Bridge, Stroud – New bridge and vital element of the wider Cotswold
Canal Project

As part of the Cotswold Canals restoration project a new bridge is being constructed
at Merrywalks, A46/A419 Junction, Stroud. The bridge will provide a gateway between
the canal and the town centre for the main road, pedestrians and cyclists.
"I have now used CEMAR for several years and found
the software extremely user friendly. As a web based product the toolkit can be
used at any location with an internet connection. This is fantastic and so useful
to track your projects when you are off site. The CEMAR support team have provided
excellent support and are prepared to consider bespoke changes to the software to
suit specific project requirements. An excellent product for administering NEC projects."
Mark Collins, Principal Engineer / Project Manager,
Gloucestershire Highways
Gloucester Quays Linkages Scheme – Regenerating links between the Docks and
City Centre
With the recent opening of the new Gloucester Quays development improvements to
access the development through Gloucester, known as ‘The Linkages’ are
underway.